Tag Archives: stumps

Site meeting – floor levels

This morning the Cordial Factory Crew had a site meeting with Paul and Robyn from Lifehouse Design and Dugald and Ross from VRBS. The number 1 item on the agenda was floor levels. During the design phase a final floor height was not specified. We were wanting to determine that at the beginning of the build – match the new floor with the existing floor level if possible. Of course, the challenge was always going to be the link between the two buildings. There will now be a step up into the hall and the house from the link.

There was a discussion about drainage and a decision was made to install a sump and pump under the floor of the hall. This could prove invaluable in the event of significant flooding.